Thu 9/13:  Here are two pallets of our flagstone (about 1.5 tons each) waiting to be unloaded.  It's called Connecticut Bluestone.  We'll use at least 6 pallets in the backyard.
Thu, 9/13:  Here's our new flagstone backyard!!    ...just kidding. 

Before they start putting stones in place, they lay them all out on the grass and wash them - putting the good side up.  Kathy and I will discard any we don't like and the stones will then be "puzzled" together on the patio.
Thu 9/13: Here's the sidewalk from the driveway to the front door in progress. 
Thu 9/13: Here's a good view of the herringbone pattern on the walk.  There's still work to do on the front step and the walkway to the street.