12 Oct 2005

 

Well I worked on the center wall, I got one more level up, then ran out of rebar. I picked up scrap foam and dumped it into the center ditch to help fill it in. I then covered it all with dirt.. I still have to build frames for the cement foundation under both doors. It will also lock the center wall into the north and south walls.

 

 

 

 

 

 

 

 

 

This is the north door frame foundation area. I will be building the frame for the cement with wood, but I will do some filling with cinder block and pieces of junk foam. After the two frames are built, I will smooth / level the dirt inside the house area then fill with the white foam. This all will be covered with dirt. The foam will help raise the level of the floor to the height I want it.

 

 

 

 

 

 