Tombolo & Ferry pier
Location: Sai Wan facing west direction
Will you propose a new ferry pier to be constructed in Tung Wan?
Answer: No, because the prevailing wind is too strong and the fetch is long, it is not suitable to construction a new Ferry Pier in Tung Wan
The breakwaters
Distribution: number of breakwaters→3 /number of passage→2
The function of the breakwaters is : weaken the strength of the wind also Ferries can be parked there during typhoon.
Water becomes polluted at the rubbish thrown out by the Ferry accumulated in front of the breakwaters affected the quality of water along the coastal areas.
Buildings on the
In Cheung Chau:
The average height of buildings on the tombolo: 9m
How is the height related to the materials that build up the tombolo?
Answer: Buildings on the tombolo are only 3 floors height because the tombolo is made up of sandy materials. Thus, the foundation may not be very stable.
Factor which favour building development | Factors which hinder the building development |
1. Relief: Flat and gentle | 1. FoundationNot stable |
2. Location:The central part of Cheung Chau | 2. Size and area:Limited |
3. Transport:Ferry Pier | 3. Others:Transportation
system is not developed (no flyover, traffic light etc.) |
4. Others:Restaurant,
Mcdonald......
|
Formation of Tombolo
→ |