Here is the index to Sam's instructions and plans with links.  You can download the PDF "Blueprint" files in one ZIP file, see below:
Back to HOME
                                             DRAWINGS AND SPECIFICATIONS                   REV-T

SAFTEY WARNING

AF-1                     ASSEMBLY FIXTURE
AF-1-1                  ASSEMBLY INSTRUCTIONS, AF-1 
AF-2  REV-A       ASSEMBLY FIXTURE,  FORWARD FRAME  ASSEMBLY
AF-2-1 REV-A     ASSEMBLY INSTRUCTIONS, AF-2
AF-3   REV-A        ASSEMBLY  INSTRUCTIONS , AF-3
AF-3-1  REV-A      ASSEMBLY FIXTURE,  A-arm FIN  /  TRUNION TONGUE
AF-4                     ASSEMBLY  FIXTURE, A-arm ASSEMBLY
AF-5                    ASSEMBLY FIXTURE,  SEAT SUPPORT INSTALLATION
AF-5-1                 ASSEMBLY INSTRUCTIONS,  AF-5 
AF-6                    ASSEMBLY FIXTUREA-arm ASSEMBLY

BL-1 REV-G        BUILD LIST (-27)

CT-1  REV-C         GETTING STARTED
CT-2                     EQUIPMENT REQUIREMENTS
CT-3                     MATERIAL REQUIREMENTS  (-8)
CT-4                     PARTS LIST (-18)
CT-5 REV-A        ASSEMBLY INSTRUCTIONS, FORWARD FRAME (-15)
CT-6                     CENTER FRAME / FORWARD FRAME  INTEGRATION (-17)
CT-7  REV-A                   ASSEMBLY INSTRUCTIONS,  TRUNION ASSEMBLY (-22)
CT-8 REV-B        ASSEMBLY INSTRUCTIONS, SEAT SUPPORT / UPPER BOW (-26)
CT-9                     ASSEMBLY INSTRUCTIONS,  STEERING CONTROL ARM
CT-10                   ASSEMBLY INSTRUCTIONS, SEAT ASSEMBLY
CT-11                  ASSEMBLY INSTRUCTIONS, UPPER BEARING MOUNT
CT-12                  ASSEMBLY INSTRUCTIONS,  LOWER BEARING MOUNT
CT-13                   INSTRUCTIONS, TRUNION INTEGRATION
CT-14                 A-Frame assembly
CT-15 REV-A      REAR SHOCK MOUNT AND SHOCK, INSTALLATION INSTRUCTIONS
CT-16                  BATTERY BOX FABRICATION AND INSTALLATION
CT-17 REV-A      ENGINE MOUNT INSTALLATION INSTRUCTIONS
CT-18                  CVT INSTALLATION INSTRUCTIONS
CT-20                  CHAIN GUARD  FABRICATION AND INSTALLATION

SK-1                     ASSEMBLY INSTRUCTIONS, FORWARD FRAME
SK-2                     CENTER FRAME / FORWARD FRAME INTEGRATION
SK-3                     ASSEMBLY INSTRUCTIONS,  A-arm FINS
SK-4                     ASSEMBLY INSTRUCTIONS,  TRUNION MOUNTING TONGUES
SK-5                     ASSEMBLY INSTRUCTIONS,  SEAT SUPPORT
SK-6                     CVT TEMPLATE
SK-7 REV-A          BATTERY BOX


HIGH QUALITY SDF SCANS IN ONE ZIP FILE

or, here are poor quality pictures of the plans you can look at:

100 REV-B          MASTER PROFILE 
PART 1   PART 2
101 REV-A          CENTER FRAME
102 REV-A          FORWARD FRAME ASSEMBLY
103 REV-A                      TRUNDLE ASSEMBLY
104 REV-A          DRIVE TRAIN
105                       SPINDLE ASSEMBLY
106                       FRONT SUSPENSION
107 REV-A          STEERING CONTROL ARM
108                       SEAT ASSEMBLY
109 REV-A          UPPER BEARING MOUNT
110                       LOWER BEARING MOUNT
111                      CONTROL PANEL
112                       A-ARM ASSEMBLY
113 REV-A            REAR SHOCK MOUNT  
114                       STEERING SHAFT
115  REV-A           BATTERY BOX ASSEMBLY
116                       WIRING DIAGRAM
117                        ENGINE MOUNT
118                        CHAIN GUARD
119                        BUNGEE RETAINER
120                       FRONT BUMPER