Front frame to support bumper and skid plates |
||||||||||||||||||||||
Skid plate next to it's mounting point. Holes in top piece mount onto the front torsion tube. |
||||||||||||||||||||||
Finished welding finally. Constructed mostly of 1.5 inch .063 wall square. The two long main beams are .125 wall |
||||||||||||||||||||||
Rear arms mounted into two channel pieces welded to the existing chassis. |
||||||||||||||||||||||
Upper mounting through angle iron into the lower torsion tube mounts. |
||||||||||||||||||||||
Same angle but farther back. The skid plate is installed in this pic |
||||||||||||||||||||||
The channels are far left. The arms are bolted to the channel. |
||||||||||||||||||||||