PROJECT PROGRESS OVERVIEW
# A New Millennium has started, and we are still working towards
completing the Arrow Replica. It sounds that we have been working
on it for sometime - but really it has only been less than 20
months (on the cockpit "tub" ). Certainly there has
been a lot of steel cut in preparation for assemblies and now
that we have welding equipment on-site, being used on a regular
basis, progress has been significant on a number of components.
The Cockpit Tub, Nose Section (Sta.120 fwd.) and the Cockpit
Structure (Sta. 120 - 292) are well underway. The Tail Cone
sub-component (Sta. 803 aft) is started and many other
sub-components are available for work to commence.
# The current target completion timing is Nov. /
Dec. 2000
That's this year folks !
FINANCIAL PROGRESS
# As a direct result of the display at this yearr's CNE financial
donations of about $1000. have been realized. The Millennium
Bureau of Canada funding has started to be used and needed
expenditures can now be undertaken.
# We are still expecting that some aviation related corporations
might also sponsor this project in one form or another.
ENGINEERING PROGRESS
# The design details for most of the components of the Replica
are now completed or underway. Engineering drawings have been
prepared for the construction of the Cockpit Section of the
Fuselage, the Radome / Nose Section. Shop floor adjustments and
clarif ications continue as assemblies progress.
# A number of full sized drawings for the fabrication of shaping
frames and wheel well doors have been completed and construction
has started on these sub-components.
# The Inner Wing structural design details have been revised to
simplify construction and work has commenced on the spars and
ribs.
# Bill Tee has indicated research is continuing on the
self-contained Power System, which will allow the Replica to be
taxied, steered and brake controlled. The power generation and
transmission design requirements are leading towards either an
electric or hydraul ic system.
# There have been a number of specific production engineering
details in the handling and welding of available materials. Stan
Porter , P.Eng. has been guiding these activities and strength
tests.
MATERIALS PROGRESS
# Steel sheet (0.04") materials have recently been donated
by Dofasco and Stainless Steel sheet (0.015") materials have
been donated by Samuel, Son & Co. Ltd. , so that the
shear-webs of the Inner and Outer Wings can be fabricated with
ease and have enough strength.
# Original parts from Avro Arrows continue to surface and are
welcomed at the TAM.
# Equipment Needs are ever present as we progress on the various
components. Of immediate need is a 3 Roller Sheet Bender
(48" width) which will be required as we get into the
skinning phases of various sections. i If you can help to find,
or supply, same it would be much appreciated.
FABRICATION PROGRESS
# Currently there are about 10 sub-components underway with
dedicated individuals and teams of volunteers making progress.
# The Joe Foster Team has the Cockpit ldblquote tubrdblquote
nearing completion. The clamshell canopies are well underway in
preparation for a fiberglass skin. A few instruments and controls
are still needed - again i if you know of any which could be
used, please contact the TAM or the Proj. Director.
# The Cockpit Structure is progressing well under the leadership
of Bruno Quattrin and his assistant Issy Spinato. f169
# Welding operations by Jim Sullivan have commenced and structure
is coming together, which is very encouraging.
# The Radome / Nose Section is also underway with the leadership
of Mark Jeffreys and his assistant Stuart Ross .
# New Outer Wing spars and ribs have been started - but i a i
major team effort is now required i to meet the schedule for
these components. Shortly, a similar major effort will be
required for the Inner Wings.
VOLUNTEERS INFORMATION
# It has been extremely encouraging to know that there are so
many folks that want to become involved in this Arrow Project.
There are about 6 sub-components ready to be started - all that
is needed are leaders and volunteers.
# Now that you know work is progressing on the Arrow Replica, i
would you please take a moment to call, fax or e-mail that you
are ready to join the active volunteers.
# To lower our communication costs in providing this UPDATE to
you, let us know your Fax # and/or e-mail address. You can Fax -
any info, your Fax # and e-mail address directly to the TAM at:
Telephone | Fax | ||
TAM | 416-638-6078 | 416-638-5509 | tamfly@hotmail.com |
Claude Sherwood | 416-661-4734 | 416-661-8174 | JCS@aol.com |
This page is not authorized by
TAM or the board of directors. We are not responsible for any
links on our page or anything that our page is linked to.
Any Comments Regarding the content of this page should be
forwarded to tamfly@hotmail.com
Aaron Stapley - Web Master
Mike McAllister - Research