July 26, 2004
Final walk through
We met with the construction
supervisor today and went over the operation of some of the
items in the house and pointed out some small issues we had that
we wished to have fixed. We are scheduled to close this
Friday as long as the occupancy certificate can be completed.
|
*** |
July 14, 2004
Driveway, Sidewalk
The driveway and sidewalk were
poured today. With that, construction is DONE! The
builder will come in and grade next to the sidewalk and
driveway. Now we wait for the final inspections and we
will be ready to move in.
|
*** |
July 13, 2004
Final cleaning, Light fixtures
The final cleaning was completed
today. All of the windows were washed, carpets vacuumed,
garage and basement floor washed, and bathroom tubs and showers
cleaned. The remaining light fixtures that were on back
order were installed as well. The only item to complete is
the concrete in the driveway and sidewalk and a final grade.
|
*** |
July 12, 2004
Garage door, Driveway & Final
carpentry
The garage door opener was
installed today. The driveway and sidewalks were prepared
for concrete pour. The mirrors in the bathrooms were
installed and the shower doors were installed in the bathroom.
|
*** |
July 7, 2004
Registers, Air conditioner
The air conditioner, registers,
and thermostat were installed today. Some of the items
left to do are mirrors in bathrooms, garage door opener,
driveway, sidewalk and final painting.
|
*** |
July 6, 2004
Carpet
The carpet was installed in all of
the rooms. The final cleaning has been scheduled for July
13. After that are the inspections and we will be able to
move in.
|
*** |
July 2, 2004
Carpet, Yard
The carpet installers began the
process of installing the carpet. The tack strips were
installed in all of the rooms and the padding was also installed
in all of the rooms. The dirt in the back yard was removed
and smoothed out.
|
*** |
July 1, 2004
Plumbing, Closet shelves &
Painting
The plumbing was completed today.
The rest of the toilets were installed and the water line for
the refrigerator was installed. All of the shelving in the
closet were installed. Another coat of paint was put on
and some of the dirt and saw dust was cleaned up.
|
*** |
|
|
|
|